QUALITY

The bore path we planned is the bore path you get.

Quality in underground work is visible in the path, the documentation, and the way the site is left. Texas Hawk builds those checks into the job, from locates through close-out.

On this page
Before the bore During the work At close-out Get in touch
Quality

Before the bore

The path is based on what is actually underground, not on a drawing alone.

We start with the plans, the utilities, and the conditions on the ground. Locates, marking, and potholing are used to verify what is underground before the drill starts — so the path is based on what is actually there, not on a drawing alone. If something does not match, we stop and resolve it before we drill.

Plans and conditions

The job starts with the drawings, the utilities, and what we find on the ground.

Locates and potholing

Marking and potholing are used to verify what is underground before the drill starts.

Stop and resolve

If something does not match the plan, we stop and resolve it before we drill.

One standard

The same checks apply to directional boring, jack and bore, and conduit work nationwide.

In the field

During the work

Bore-tracking is used to monitor depth and path while the work is underway. Production is recorded in the field with project software and a mobile app, so footage, changes, and issues are captured as they happen rather than reconstructed later. Equipment is inspected; anything unsafe is tagged out. Drilling fluid is managed and contained, with spill materials on site.

  • Bore-tracking. Depth and path are monitored while the work is underway.
  • Field records. Footage, changes, and issues are captured as they happen.
  • Equipment checks. Equipment is inspected, and anything unsafe is tagged out.
  • Fluid control. Drilling fluid is managed and contained, with spill materials on site.
Close-out

At close-out

We restore the site, hand over the records requested for the job, and close the work against the plan. If a punch list is required, it is worked until the item is done. The aim is simple: the installation matches what was agreed, and the owner or general contractor has the documentation to show it.

Quality questions on an active job should go to the project lead. For program standards, prequalification, or a review of our quality practices, use the address below.