Data center directional boring. We can be there nationwide.

Data centers are one of the fastest-growing markets for directional boring — power, fiber and campus utilities. Whether the campus is in Texas or three states away, one call to Texas Hawk puts a crew on site through our 300+ crew network.

Commercial projects onlyMillions of feet drilledCrews nationwide
Start Your ProjectCOMMERCIAL ONLY
Step 1 of 3Your project
Project type (select all that apply)
Job site location
Commercial projects only. Prefer to talk? Call 817-268-9484
Texas Hawk Can-Am UTV parked next to a Vermeer horizontal directional drilling rig on a data center site
Built for fast-moving campuses

Keep the schedule moving

Data center timelines don’t wait. We bore under roads, pipelines, existing utilities and active plant areas so trenching and other trades can keep working.

  • Power conduit between buildings, switchgear and utility tie-ins.
  • Fiber and communication conduit across large campuses.
  • Perimeter and security-camera conduit runs including jobs with hundreds of thousands of feet.
  • Crossings under pipelines, roads and live infrastructure.
  • Big conduit bundles including pulls of 48 two-inch conduits and more in a single bore.
On the ground

The scale of a data center campus

Heavy earth-moving equipment, large excavators and miles of orange conduit on a Texas Panhandle AI data center campus.

Excavator, articulated dump truck and crew working next to a drilling rig on a large Texas data center campus
Big earth-moving equipment working next to the drill rig
Bundles of orange conduit sweeping across a graded data center pad in the Texas Panhandle
Conduit bundles sweeping across the pad
Heavy equipment fleet staged across a large data center site
A full equipment fleet staged on the campus
Low-angle close-up of orange conduit on a data center site
Close-up of the conduit
Wheel loaders and haul trucks lined up on a data center site
Wheel loaders and haul trucks on site
Bundles of orange conduit leading toward the horizon across a large Texas data center site
Conduit runs leading to the horizon
Proof in the pullback

Dozens of conduits, one pull

Texas Hawk pulls bundles of 48 two-inch conduits and more in a single bore. These photos show the result: a mud-covered bundle held up by an excavator after pullback, and the concrete vault where the conduits come in.

Mud-covered bundle of two-inch conduits lifted out of the bore pit by an excavator after an HDD pullback
A bundle of two-inch conduits held up by an excavator after pullback
Orange conduit bundles stretching toward the horizon on a data center site
Orange conduit bundles stretching toward the horizon across the site
Concrete vault with orange conduits entering from both sides at a data center
Conduits entering the concrete vault from both sides

One bore, one pull, dozens of conduits in the ground at once.

Why Texas Hawk

Experience, precision and one point of contact

Millions of feet drilled

Plant-environment experience built through directional boring on commercial and industrial sites.

Precise and documented

Bore-tracking technology and daily production records keep every path accurate and every foot accounted for.

Room to scale

One call, any market: our 300+ crew network covers large campuses and multi-site programs nationwide.

How we do it

Four steps, every campus

Crew installing a conduit duct bank on a Texas data center construction site
STEP 1

Strategy

Find cost-effective solutions up front, avoiding overruns, permitting delays, re-designs and utility conflicts.

Line of horizontal directional drilling rigs staged on a data center site
STEP 2

Equipment

The right HDD rig, hydrovac truck or auger boring machine matched to the bore, so you never pay for more machine than the job needs.

Crew installing a conduit duct bank on a Texas data center construction site
STEP 3

Crew & Support

Crew leaders, operators and locators, backed by a project lead who stays on your job.

Bore project management software showing a site map on a desktop monitor and a phone
STEP 4

Management

Cloud project software and a mobile app record production in the field, so reporting stays accurate.

See the Full Process →
Texas flag icon
Where we do it

Service areas

Based in the Dallas-Fort Worth metroplex, with yards across all of Texas.

  • Austin
  • San Antonio
  • Dallas
  • Plano
  • Fort Worth
  • Brownsville
  • Houston
  • Amarillo
  • Lubbock
  • El Paso
EL PASOAMARILLOLUBBOCKAUSTINSAN ANTONIOHOUSTONBROWNSVILLEDFW METROPLEX · CLOSE-UPFORT WORTHDALLASPLANOSOUTHLAKE HQ
Service cityHeadquarters · Southlake / DFW
Also working inside plants

Industrial plants & facilities

The same plant-environment experience applies to industrial sites: conduit and utility crossings planned around your operations, safety rules and shutdown windows.

Long utility trench and excavator at an industrial plant site
Start your data center project

Let’s go Texas Hawk

Commercial projects only. Fill out the quick form or call us — we’ll take it from there.

Call us now817-268-9484Commercial & industrial projects only
Start Your ProjectCOMMERCIAL ONLY
Step 1 of 3Your project
Project type (select all that apply)
Job site location
Commercial projects only. Prefer to talk? Call 817-268-9484
☎ Call 817-268-9484Get a Quote