COMMERCIAL PROJECTS ONLY · SOUTHLAKE, TEXAS · CREWS NATIONWIDECall 817-268-9484
Texas Hawk directional boring contractor logo
☎ 817-268-9484Get a Quote
Compact directional drilling rig in an equipment yard
Home / Service Areas / El Paso County
EL PASO COUNTY, TEXAS

Directional boring in El Paso County, across desert sand, caliche and mountain rock.

Commercial and industrial HDD for conduit, fiber, water, sewer and gas in El Paso and across the county, planned around caliche, rock and the City and County bore and pavement-cut rules.

Commercial projects onlyBased in Southlake300+ crew network
Start Your ProjectCOMMERCIAL ONLY
Step 1 of 3Your project
Is this job commercial or residential? *
Project type (select all that apply)
Job site location
Commercial projects only. Prefer to talk? Call 817-268-9484
Based in Southlake

Mobilizing to far West Texas from the Dallas–Fort Worth metroplex

Texas Hawk is headquartered in Southlake and our crews are based in the Dallas–Fort Worth metroplex. El Paso is a very long haul west, so for El Paso County projects we plan the rig and crew mobilization into the schedule and price from the start. When a program outgrows one crew, our 300+ crew network can mobilize nationwide.

  • Conduit, fiber, water, sewer and gas installed by directional boring for commercial and industrial sites.
  • Rock-aware planning where mountain limestone and granite sit close to the surface.
  • Permit paperwork and utility coordination sorted out before the rig mobilizes.
  • Lean, direct and accountable. Low overhead and a straight line to the people running your job.
Crew locating existing utilities before a bore
Ground conditions

What’s under El Paso County

El Paso County is desert basin ground with mountains rising out of it. The USGS state geologic map shows sand, basin fill and alluvium across most of the county, with limestone and granite in the Franklin Mountains. Site soil borings set the final tooling and fluid program; this is the general picture.

Sand sheets and dunes

The sand sheet covers about 32 percent of the county and dune sand about 5 percent. Loose sand caves and loses drilling fluid, so mud selection and reaming are matched to the boring log.

Bolson deposits and alluvial fans

Bolson deposits cover about 13 percent of the county, with another 7 percent mapped as Quaternary-Tertiary bolson, and alluvial fans and older alluvium add about 18 percent. These are layered sand, silt, clay and gravel washed down from the mountains, so a bore can change ground type several times.

Caliche

In the Hueco Bolson, caliche, cemented calcium carbonate, commonly occurs 2 to 4 feet below the surface, according to the Texas Water Development Board. Shallow caliche matters for pits, potholes and shallow bores, and for tooling choice.

River alluvium

Alluvium covers about 15 percent of the county, mostly along the Rio Grande valley and its drainage. Soft, wet soil and irrigation features are common there, so crossings are planned with depth and fluid containment in mind.

Mountain rock

Hueco Limestone covers about 3 percent of the county, and the El Paso Formation, Bliss Sandstone, Fusselman Limestone, Mingus Formation and granite make up smaller areas. Franklin Mountains construction has required blasting near rail, according to a published geotechnical paper, so rock is a real possibility on some alignments.

How that shapes the plan

Soil data drives the bore profile, tooling, drilling fluid and vacuum capture. Caliche and rock change the schedule, so we price and plan for it up front.

Utilities, agencies & permits

Who you answer to on an El Paso County bore

In El Paso the City and the County each publish written rules for boring and pavement cuts, and the electric utility has its own crossing requirements. We line them up early so they do not hold up mobilization.

City of El Paso permits

The City requires both a Traffic Control Permit and a Pavement Cut Permit for excavation, boring, coring or drilling. Applications are submitted at least 48 hours before work, with plans that follow Chapter 6 of the Texas Manual on Uniform Traffic Control Devices, and inspection is scheduled at least 24 hours ahead.

Signals and lighting

Before work the contractor verifies illumination and traffic-signal locations, and signal line locates are requested with the 811 ticket. Signal cabling is easy to miss on a bore path, so we confirm it.

El Paso County road crossings

County pipeline permit rules call for road crossings by jack and bore in steel casing to TxDOT Item 476, with the casing extending 5 feet beyond the right-of-way lines and no open cuts in county road pavement.

County placement and timing

Pipelines are placed 20 feet off the right-of-way line with 60 inches of cover. Road cut permits are obtained no more than 30 days ahead and the work is done within 14 days, bore pits stay open 14 days at most and sit 10 feet from the pavement edge unless approved in writing, and shoring may be required based on soil conditions.

El Paso Electric and co-ops

El Paso Electric serves El Paso County. Its right-of-way crossing guidance calls for pipelines to cross near perpendicular, and cathodic-protection studies may be required. The Texas Electric Cooperatives county list also shows the Rio Grande Electric Cooperative for El Paso County.

State highways

El Paso County is in TxDOT’s El Paso District with Brewster, Culberson, Hudspeth, Jeff Davis and Presidio counties. Work in state right-of-way is permitted through TxDOT’s utility process.

Boring machine loaded on a trailer
Where the work is

Commercial and industrial sites across the borderland

El Paso County work spans commercial and industrial sites inside the city, growing edges such as Horizon City and Socorro, and rock-and-rail corridors along the mountains.

  • Industrial and commercial sites: utilities under live operations, see industrial plants & large sites.
  • Road, rail and drainage crossings: see jack & bore / dry bore.
  • Water, sewer and gas service lines for commercial development in El Paso, Socorro, Horizon City and Canutillo.
How we run an El Paso County job

Plan first, then bore

Review and plan

Plans, utility records and soil data reviewed up front, with the bore set to the City and County rules and to caliche and rock conditions.

Locate and permit

Texas811 notice at least two working days ahead, signal and utility lines verified, and City or County paperwork started early.

Bore and contain

Bore the path, track it, and capture drilling fluid so it stays out of drainage ways and storm drains.

Document

Daily production reports and as-builts for close-out.

El Paso County questions

Straight answers

Does El Paso need more than one permit for a bore?

Yes. The City requires both a Traffic Control Permit and a Pavement Cut Permit for excavation, boring, coring or drilling.

How much notice does the City need?

Applications are submitted at least 48 hours before work, and inspection is scheduled at least 24 hours ahead.

Can you open-cut a county road in El Paso County?

No. County road crossings are done by jack and bore in steel casing, with no open cuts in county road pavement.

How long can a county bore pit stay open?

14 days at most, and it must sit 10 feet from the pavement edge unless the County approves otherwise in writing.

Is caliche a problem in El Paso?

It can be. Caliche commonly occurs 2 to 4 feet below the surface in the Hueco Bolson, so it affects pits, potholes, shallow bores and tooling.

Who is this for?

Commercial and industrial projects only: developers, general contractors, utilities and electrical, telecom and mechanical contractors.

Start your El Paso County project

Let’s go Texas Hawk

Commercial projects only. Fill out the quick form or call us — we’ll take it from there.

Call us now817-268-9484Commercial & industrial projects only
Start Your ProjectCOMMERCIAL ONLY
Step 1 of 3Your project
Is this job commercial or residential? *
Project type (select all that apply)
Job site location
Commercial projects only. Prefer to talk? Call 817-268-9484
☎ Call 817-268-9484Get a Quote