Directional boring in Collin County, built around county, city and water-district bore rules.

Commercial and industrial HDD for conduit, fiber, water, sewer and gas in Plano, Frisco, McKinney, Allen and across the county, by a Southlake-based team working in the north metroplex.

Commercial projects onlyBased in Southlake300+ crew network
Start Your ProjectCOMMERCIAL ONLY
Step 1 of 3Your project
Is this job commercial or residential? *
Project type (select all that apply)
Job site location
Commercial projects only. Prefer to talk? Call 817-268-9484
Based in Southlake

North-metroplex crews, close to the fast-growing Collin County corridor

Texas Hawk is headquartered in Southlake and our crews are based in the Dallas–Fort Worth metroplex, so Plano, Frisco, McKinney and Allen sit inside our everyday service area. Collin County is one of the busiest places in the state for new commercial development, and our 300+ crew network can mobilize nationwide when a program is bigger than one crew.

  • Conduit, fiber, water, sewer and gas installed by directional boring for commercial and industrial sites.
  • County road and city street crossings bored to each owner’s written rules instead of open-cut.
  • Permit paperwork and utility coordination sorted out before the rig mobilizes.
  • Lean, direct and accountable. Low overhead and a straight line to the people running your job.
Crew member pointing out a bore path on a site plan
Ground conditions

What’s under Collin County

Collin County is chalk and clay country. The USGS state geologic map shows Austin Chalk as nearly half of the surface, with clay-rich formations and river deposits making up most of the rest. Site soil borings set the final tooling and fluid program; this is the general picture.

Austin Chalk, about half the county

Austin Chalk is at the surface across about 49 percent of the county. Chalk is a soft, fine-grained limestone that often bores well, but hard beds and weathered, sticky zones both show up, so tooling is chosen from the soil boring.

Ozan Formation and Marlbrook Marl

The Ozan Formation covers about 19 percent of the county and the Marlbrook Marl about 9 percent. Clay-rich ground like this sticks to tooling and moves with moisture, which makes fluid control and careful reaming important.

Eagle Ford shale

The Eagle Ford Formation makes up about 6 percent of the county. Shale near the surface weathers to heavy clay, and depth matters under slabs and pavements that react to moisture.

Creek alluvium and terraces

Alluvium covers about 8 percent of the county and terrace deposits about 4 percent, mostly along creeks and the East Fork of the Trinity River. Expect soft or sandy ground, shallow groundwater and flood-prone low spots, so crossings go deep with fluid containment in place first.

Smaller chalk units in the east

Pecan Gap Chalk, Wolfe City and Gober Chalk appear as thin slices in the eastern part of the county. A single bore can pass from chalk to clay, and we plan the entry and exit layouts for that change.

How that shapes the plan

Soil data drives the bore profile, tooling, drilling fluid and vacuum capture. Hard or sticky ground changes the schedule, so we price and plan for it up front.

Utilities, agencies & permits

Who you answer to on a Collin County bore

Collin County is a patchwork of county roads, fast-growing cities, a regional water district and state highways. Each owner has its own written rules, and we line them up early so they do not hold up mobilization.

Collin County right-of-way

County policy requires lines under any county roadway or paved driveway to be bored or tunneled and encased, with open cut allowed only for pipe of 30 inches or larger and extra fees. Rural bores must extend beneath all travel lanes plus five feet toward the ditch centerline; curbed urban bores must extend beneath the travel and parking lanes and two feet past the back of curb. A Notice of Proposed ROW Activity is filed online, and work cannot begin until it is approved.

Plano

Plano’s right-of-way rules call for bore drawings showing the diameter and start and end points, and a profile drawing where the bore crosses a main of 12 inches or larger. Longitudinal bores stay 9 feet from larger water and sewer mains and 5 feet from smaller ones, with 24 inches of vertical separation from city infrastructure. Permit review can take up to 10 working days.

McKinney

McKinney’s right-of-way manual requires concrete streets and driveways to be bored, test holes at each water, sewer or storm crossing, and bore pits kept 5 feet off the roadway. Voids are pressure grouted, a sewer camera inspection may be required, and missile and jetting methods are not allowed.

Frisco and the other cities

Frisco requires contractors to register for right-of-way work, hold an approved right-of-way permit and have line locates in place before digging. Allen, Wylie and the other cities each have their own permit steps, which we confirm for the specific address.

North Texas Municipal Water District

Crossings of North Texas Municipal Water District water and wastewater pipelines go through design review and a pipeline crossing application. Those approvals take time, so they are requested as soon as the alignment is known.

Electric, gas and state highways

Oncor Electric Delivery serves Plano, Frisco, McKinney and Allen, and the CoServ Electric, Fannin County, Farmers and Grayson-Collin cooperatives serve other parts of the county. Atmos Energy’s Mid-Tex Division runs gas in the metroplex. Collin County is in TxDOT’s Dallas District, where the utility owner files for any state right-of-way crossing.

Heavy equipment lined up on a commercial construction site
Where the work is

Commercial campuses, data centers and growing city centers

Collin County keeps adding commercial campuses, corporate sites and utility-heavy projects, and local reporting in May 2026 described data center activity in Plano and Allen. The work is a mix of new development and infill beside live streets.

  • Data center and utility power: duct banks and fiber, see our data center work.
  • Industrial and corporate sites: utilities under live operations, see industrial plants & large sites.
  • Road, rail and drainage crossings: see jack & bore / dry bore.
  • Water, sewer and gas service lines for commercial development in Plano, Frisco, McKinney, Allen and Wylie.
How we run a Collin County job

Plan first, then bore

Review and plan

Plans, utility records and soil data reviewed up front, with the bore sized and set to meet each owner’s written crossing rules.

Locate and permit

Texas811 notice at least two working days ahead, test holes or potholes at crossings, and county, city or water-district approvals started early.

Bore and contain

Bore the path, track it, pressure grout where the owner requires it, and capture drilling fluid so it stays out of storm drains and creeks.

Document

Daily production reports and as-builts for close-out.

Collin County questions

Straight answers

How far does a bore have to extend under a Collin County road?

On a rural county road the bore runs beneath all travel lanes plus five feet toward the ditch centerline. On a curbed urban road it runs beneath the travel and parking lanes and two feet beyond the back of curb.

Can a county road be open-cut instead?

Only for pipe of 30 inches or larger, and with additional fees. Lines under county roadways and paved driveways are otherwise bored or tunneled and encased.

What does Plano want to see on a bore?

Drawings that show the bore diameter and its start and end points, plus a profile where the bore crosses a water or sewer main of 12 inches or larger, with 24 inches of vertical separation from city infrastructure.

Does McKinney allow jetting or missile methods?

No. McKinney bans them, requires bore pits 5 feet off the roadway, test holes at utility crossings and pressure grouting of voids.

How long does permitting take?

It depends on the owner. Plano’s review can take up to 10 working days, Collin County requires approval of its online notice before work starts, and water district and rail reviews run longer, so we start them first.

Who is this for?

Commercial and industrial projects only: developers, general contractors, utilities and electrical, telecom and mechanical contractors.

Start your Collin County project

Let’s go Texas Hawk

Commercial projects only. Fill out the quick form or call us — we’ll take it from there.

Call us now817-268-9484Commercial & industrial projects only
Start Your ProjectCOMMERCIAL ONLY
Step 1 of 3Your project
Is this job commercial or residential? *
Project type (select all that apply)
Job site location
Commercial projects only. Prefer to talk? Call 817-268-9484
☎ Call 817-268-9484Get a Quote