Commercial and industrial HDD for conduit, fiber, water, sewer and gas in San Antonio and across Bexar County, planned around limestone, the Edwards Aquifer and the City’s written excavation criteria.
Texas Hawk is headquartered in Southlake and our crews are based in the Dallas–Fort Worth metroplex. San Antonio is a long haul south, so for Bexar County projects we plan the rig and crew mobilization into the schedule and price from the start. When a program outgrows one crew, our 300+ crew network can mobilize nationwide.

Bexar County sits on the Balcones Escarpment, where Hill Country limestone to the north meets sandy and clayey Coastal Plain ground to the south. The USGS state geologic map lists more than a dozen surface units. Site soil borings set the final tooling and fluid program; this is the general picture.
The Wilcox Group is at the surface across about 18 percent of the county, mostly in the south. It is a mix of sand, silt and clay, so conditions change from one reach of a bore to the next.
Terrace deposits cover about 16 percent of the county and Leona Formation about 8 percent, mostly along the San Antonio River and creeks. Expect gravel, cobbles and sandy zones with shallow groundwater, which are hard on tooling and fluid control.
Glen Rose Limestone covers about 13 percent of the county, Edwards Limestone about 10 percent and the Buda and Del Rio units about 2 percent, mostly in the north. Hard, fractured limestone can hold voids, so the plan includes a response if fluid is lost.
Pecan Gap Chalk covers about 8 percent of the county, Navarro with Marlbrook marl about 7 percent and Austin Chalk about 5 percent. Chalk can bore well, while the clay-rich beds stick to tooling and move with moisture.
Carrizo Sand covers about 5 percent of the county, Midway about 3 percent and Uvalde Gravel about 3 percent. Loose sand and gravel can cave, so mud selection and reaming are matched to the log.
Soil data drives the bore profile, tooling, drilling fluid and vacuum capture. Rock and gravel change the schedule, so we price and plan for it up front.
In Bexar County the City of San Antonio’s criteria are detailed and the Edwards Aquifer adds a layer on top. Each owner has written rules, and we line them up early so they do not hold up mobilization.
Contractors register in the City’s Right-of-Way Management System. Utility excavation of 50 linear feet or more needs a permit submitted at least 30 days ahead, with plans.
Under the City’s Utility Excavation Criteria Manual, streets with a pavement condition index of 86 or higher must be bored or jacked unless the director approves otherwise, with encasement and grouting approved by an engineer. Pothole locates are not allowed on those streets unless keyhole or vacuum extraction with a core of 6 inches or less is used.
The City approves bore pit locations. The bore must keep a minimum of 36 inches from the surface to the top of the bore, water-jetting boring equipment is not permitted, and the annulus is pressure grouted along its entire length. Pits are backfilled and plated, or fenced with 6-foot chain link, at the end of each day, and pits over 4 feet deep may need temporary barriers.
Utility lines that do not carry pollutants are generally exempt from an Edwards Aquifer Protection Plan, but temporary erosion and sediment controls are required. If a void is found, work stops and TCEQ is notified. The San Antonio Water System enforces the City’s Aquifer Protection Ordinance.
CPS Energy’s electric service area covers 1,515 square miles, including Bexar County and parts of Atascosa, Bandera, Comal, Guadalupe, Kendall, Medina and Wilson counties, and it provides gas in Bexar, Comal, Guadalupe and Medina counties. The Bandera, Guadalupe Valley, Karnes and Pedernales electric cooperatives serve other parts of Bexar County.
Bexar County is in TxDOT’s San Antonio District with Atascosa, Bandera, Comal, Frio, Guadalupe, Kendall, Kerr, McMullen, Medina, Uvalde and Wilson counties. Work in state right-of-way is permitted through TxDOT’s utility process.

Bexar County work runs from infill inside Loop 410 to growth corridors on the north and west sides. CPS Energy has said it is planning for large loads, including data centers, which adds feeder and duct bank work.
Plans, utility records and soil data reviewed up front, with the bore set to the City’s criteria and the aquifer rules.
Texas811 notice at least two working days ahead, utilities verified where the bore crosses them, and City of San Antonio paperwork started early.
Bore the path, track it, pressure grout where required, and capture drilling fluid so it stays out of creeks and the aquifer.
Daily production reports and as-builts for close-out.
For streets with a pavement condition index of 86 or higher, yes, unless the director approves otherwise, and the encasement and grouting are approved by an engineer.
A minimum of 36 inches from the surface to the top of the bore. The City approves pit locations, and pits are plated or fenced at the end of each day.
No. Water-jetting boring equipment is not permitted, and the annulus is pressure grouted along its entire length.
For utility excavation of 50 linear feet or more, the permit is submitted at least 30 days ahead with plans, so we start permitting before the rig is scheduled.
Work stops and TCEQ is notified. That is why we plan fluid and tooling for fractured limestone and keep the aquifer rules in the pre-job briefing.